This unit from 2012 was the first Post Smolt system ever built by a RAS supplier. It has not just stood the challenging tests for post smolt systems and saltwater RAS, it has become the model for post Smolt RAS design.

Norway 2011-2012 Grieg Seafood, Lebesby:
2 x salar 120 + 1 x salar 160
Capacity: 6.100 kg feed/day